Notice: Undefined index: post_id in /home/onlinedimensions/public_html/kamalbouzeineddine.com/wp-content/themes/kamal/content.php on line 5
Bsaba

SUBJECT: GEOTECHNICAL SURVEY
ARIGE: 2 BLOCKS
LOT N0: 193-BSABA
Presented to: Eng: Abdou Bwayz
Date: 29-March- 2017

SUBJECT: GEOTECHNICAL SURVEY
ARIGE: 1 BUILDING
LOT N0: 247-BSABA
Presented to: Mr. Elie Wehbe
Date: 4-April- 2015

SUBJECT: GEOTECHNICAL SURVEY
ARIGE: 1 BUILDING
LOT N0: 353 – BSABA
Presented to: Mr.Michail Sleem
Date: 13- December- 2016

SUBJECT: GEOTECHNICAL SURVEY
ARIGE: 1 BUILDING
LOT N0: 408– BSABA.
Presented to: Eng.: Abdou Boueiz
Date: 2- August – 2016

SUBJECT: GEOTECHNICAL SURVEY
ARIGE: 1 BUILDING
LOT N0: 414– BSABA.
Presented to: Mr. Michal Slim&Co
Date: 14- November – 2012

SUBJECT: GEOTECHNICAL SURVEY
ARIGE: STATION FUEL
LOT N0: 431– BSABA.
Presented to: Mr. Cloud Abi Antoun
Date: 4- March- 2017

SUBJECT: GEOTECHNICAL SURVEY
ARIGE: 1 BUILDING
LOT N0: 483- BSABA
Presented to: Mr. Raymond Rahal
Date: 30 –August – 2017

SUBJECT: GEOTECHNICAL SURVEY
ARIGE: 1 BUILDING
LOT N0: 502- BSABA
Presented to: Mr. Michel Slim
Date: 23 –October – 2015

Leave a Reply

Your email address will not be published. Required fields are marked *